Context

The situation that demanded action

FORTS Logistics serves as a critical equipment provider for disaster response operations across the Southeastern United States.

Stakes

What was at risk if we failed

Traditional logistics providers couldn't meet the speed and precision requirements: equipment must arrive before crews, in the right sequence, at sites that may have limited access.

Constraints

The obstacles we had to navigate

  • Sub-24-hour deployment windows with no flexibility
  • 11+ distinct equipment types requiring specialized carriers
  • Multiple simultaneous staging sites with different access requirements
  • Site rules: specific check-in procedures, offload sequencing, staging positions

What Core Did

Our execution approach

LIVE
  • Established dedicated 24/7 control tower coverage for FORTS activations
  • Built carrier bench of pre-vetted flatbed, step-deck, and specialized equipment haulers
  • Created deployment playbooks for each equipment type with carrier matching
  • Implemented arrival-driven dispatch: equipment sequenced by site priority

Outcomes

Measurable results delivered

  • 100% of deployments met staging deadlines—zero missed windows
  • Average deployment time reduced from 36+ hours to under 18 hours
  • Zero equipment damage or loss during transport
  • Established as FORTS' exclusive logistics partner for disaster response

What This Proves

  • Core's control tower model can orchestrate complex, time-critical deployments at scale
  • Pre-vetted carrier relationships enable sub-24-hour response times
  • Playbook-driven operations ensure repeatability across different disaster scenarios
The Situation

The Challenge

FORTS Logistics serves as a critical equipment provider for disaster response operations across the Southeastern United States.

When disasters strike, FORTS requires immediate coordination of heavy equipment—generators, light towers, fuel trailers, water pumps, and more—to multiple staging sites.

Traditional logistics providers couldn't meet the speed and precision requirements: equipment must arrive before crews, in the right sequence, at sites that may have limited access.

Core Logistics was engaged to serve as the 24/7 control tower for all disaster deployment logistics.

Constraints

The Obstacles

  • Sub-24-hour deployment windows with no flexibility
  • 11+ distinct equipment types requiring specialized carriers
  • Multiple simultaneous staging sites with different access requirements
  • Site rules: specific check-in procedures, offload sequencing, staging positions
  • Weather routing contingencies for active disaster zones
  • Driver staging limits and hours-of-service compliance
  • Real-time communication with site coordinators and FORTS operations
Our Response

The Execution

01

Established dedicated 24/7 control tower coverage for FORTS activations

02

Built carrier bench of pre-vetted flatbed, step-deck, and specialized equipment haulers

03

Created deployment playbooks for each equipment type with carrier matching

04

Implemented arrival-driven dispatch: equipment sequenced by site priority

05

Developed site-specific staging protocols with check-in verification

06

Established escalation cadence: 2-hour status updates, immediate exception alerts

07

Close-out verification: staging confirmation, equipment condition documentation

Timeline

How It Unfolded

T+0
Activation Received
FORTS triggers deployment request with equipment manifest and site locations
T+2hrs
Carrier Assignment Locked
All loads assigned to pre-vetted carriers with confirmed availability
T+4hrs
First Equipment Rolling
Priority equipment dispatched to primary staging site
T+12hrs
Multi-Site Coordination
Simultaneous deliveries tracked across all staging locations
T+18hrs
Staging Verification
All equipment confirmed on-site, positioned per site coordinator requirements
T+24hrs
Close-Out Complete
Documentation package delivered: staging confirmations, exception log, carrier performance
Results

The Outcome

  • 100% of deployments met staging deadlines—zero missed windows
  • Average deployment time reduced from 36+ hours to under 18 hours
  • Zero equipment damage or loss during transport
  • Established as FORTS' exclusive logistics partner for disaster response
  • Playbook now supports rapid scaling for multi-state disaster events
Investment Thesis

What This Proves

  • Core's control tower model can orchestrate complex, time-critical deployments at scale
  • Pre-vetted carrier relationships enable sub-24-hour response times
  • Playbook-driven operations ensure repeatability across different disaster scenarios
  • Exception discipline and real-time communication prevent delays before they occur
"When we get the call, we need equipment moving within hours, not days. Core's team operates like an extension of our own—they understand that in disaster response, there's no margin for error."
Operations Director
FORTS Logistics
Key Proof Recap
Proof you can scan fast.

These metrics are designed for CIM readers: what happened, how fast, and why it matters.